If your metal roof has seen better days, you might be wondering what actually happens when it’s time for a metal roof replacement on the Sunshine Coast.
How does the process work? What happens to your old roof? How long does the replacement take? And what happens if your roof has been damaged by a storm or hail?
At Sunstate Roofing Services, we specialise in metal roof replacements across the Sunshine Coast, Noosa, Gympie and North Brisbane. From your initial enquiry through to the finished roof, our team coordinates the replacement process to make it as straightforward as possible.
Here’s what you can expect.
1. It starts with your enquiry
The first step is getting in touch with Sunstate Roofing Services about your roof replacement.
You may be looking to replace an ageing roof, a roof affected by ongoing issues, or a roof damaged by a storm or hail event.
Sunstate specialises in full metal roof replacements.
When you enquire, you’ll provide information about your property and existing roof, including the current roofing material and your location.
Sunstate services areas from North Brisbane through the Sunshine Coast, Noosa and the Gympie region, including suburbs such as Maroochydore, Caloundra, Coolum, Noosa, Nambour and Gympie.
2. Your roof is assessed
Before your replacement can be planned, your existing roof needs to be assessed.
This helps determine the condition of the roof and what will be involved in replacing it.
Sunstate can provide free quotes or online estimates, depending on the property and information available. Where required, an assessment can help the team understand the existing roof and plan the replacement appropriately.
If your roof is damaged by hail or a storm, this assessment can also help establish the extent of the damage and whether a full roof replacement is required.
3. You receive your quote
Once the roof has been assessed, Sunstate provides a quote outlining the proposed replacement work.
Every roof is different, so the cost of a metal roof replacement on the Sunshine Coast can vary depending on factors such as the size and design of the roof, existing roofing material, access and the work required.
This is also the time to ask any questions you may have about the replacement, materials, timing or what is included in the project.
Sunstate’s team focuses on keeping customers informed throughout the process, from the initial quote through to completion.
4. Your replacement is organised
Once you’ve approved the quote, the project can move into the planning and scheduling stage.
This is where the required materials, trades and other services involved in the replacement are coordinated.
Our team handles coordination of trades and service reconnections as part of its roof replacement service.
This can be particularly important when a roof replacement involves things such as solar equipment, skylights or other roof-mounted services.
The exact preparation required will depend on the individual property.
5. The old roof is removed
Now the replacement work begins.
The existing roofing is removed to make way for the new roof.
This can involve removing the old metal sheets and other roofing components before the new roof can be installed.
If additional work or coordination is required as part of the replacement, Sunstate manages the relevant trades and services to help keep the project moving.
Once the old roofing materials have been removed, the replacement can progress to the installation stage.
6. Your new metal roof is installed
With the existing roof removed and the project prepared, your new roofing can be installed.
Sunstate works with quality Australian roofing suppliers and uses products including BlueScope and COLORBOND®, with roofing options suitable for homes across the Sunshine Coast and surrounding areas.
The exact installation process and timeframe will depend on your property, roof size, weather and the scope of the replacement.
For many homeowners, the result is a completely refreshed roof that not only improves the appearance of the home but provides a new roofing system in place of the old one.
7. The finishing touches are completed
A roof replacement isn’t just about putting new sheets on the roof.
Once the main installation is complete, the finishing work can be carried out to complete the replacement.
This may include the required flashings, fixings and other components depending on the individual project.
Sunstate also places a strong focus on keeping sites clean and maintaining safety standards throughout the work. The team carries out quality control checks and maintains strict onsite safety standards.
Once the work is finished, the site is cleaned up, and the roofing project is brought to completion.
8. Your new roof is ready
And that’s it! You’ve got a new roof.
While a metal roof replacement on the Sunshine Coast is a significant project, knowing what happens at each stage can make the process much easier to understand.
From your initial enquiry and roof assessment through to quoting, planning, installation and clean-up, Sunstate Roofing Services manages the replacement process with a focus on communication, organisation and quality workmanship.
If your existing roof is ageing, showing significant corrosion, experiencing recurring problems or has been affected by storm or hail damage, it may be time to consider whether a full roof replacement is the right option.
Thinking about replacing your metal roof?
Sunstate Roofing Services specialises in metal roof replacements across the Sunshine Coast and Gympie, servicing areas from North Brisbane through to Gympie and the Sunshine Coast.
If your roof is looking a little worse for wear, get in touch with the Sunstate team to discuss your roof replacement options.